New Facility for Mathematics at Missouri Southern State University

A dedication and ribbon cutting ceremony for Jeremiah “Jay” Nixon Hall will be held  on January 31, inside the newest addition to Missouri Southern State University’s campus in Joplin, MO.

A little more than two years after breaking ground, the $8.1-million, 21,000-square-foot facility was up and running for the beginning of the Spring 2019 semester just as planned.

Facility for Mathematics at Missouri Southern State University

Named for a former Missouri governor, Nixon Hall is the new home for the university’s mathematics program and features classrooms, lecture halls, faculty offices, a computer lab, and mathematically themed interior design elements. Nixon Hall is designed to facilitate collaboration between students and faculty through the use of different types of collaboration spaces of various sizes. Each lecture hall is flexible in that two lecture halls can open up to be one large lecture hall space for large educational groups.

It also includes a three-story atrium and a skywalk that connects the facility to the second floor of the recently renovated Reynolds Hall—something that makes the trip back and forth more expedient for STEM (science, technology, engineering and math) students.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.