New Facility for Mathematics at Missouri Southern State University

A dedication and ribbon cutting ceremony for Jeremiah “Jay” Nixon Hall will be held  on January 31, inside the newest addition to Missouri Southern State University’s campus in Joplin, MO.

A little more than two years after breaking ground, the $8.1-million, 21,000-square-foot facility was up and running for the beginning of the Spring 2019 semester just as planned.

Facility for Mathematics at Missouri Southern State University

Named for a former Missouri governor, Nixon Hall is the new home for the university’s mathematics program and features classrooms, lecture halls, faculty offices, a computer lab, and mathematically themed interior design elements. Nixon Hall is designed to facilitate collaboration between students and faculty through the use of different types of collaboration spaces of various sizes. Each lecture hall is flexible in that two lecture halls can open up to be one large lecture hall space for large educational groups.

It also includes a three-story atrium and a skywalk that connects the facility to the second floor of the recently renovated Reynolds Hall—something that makes the trip back and forth more expedient for STEM (science, technology, engineering and math) students.

Featured

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.