VLK Architects and Royse City ISD Break Ground on Bobby Summers Middle School

On March 7, VLK Architects joined with Royse City ISD students, staff, administrators, and community members to celebrate breaking ground on the district’s new Bobby Summers Middle School.  The school’s namesake was also in attendance to commemorate this new campus. This facility is the largest project included in the district’s 2018 bond and will serve 1,200 middle school students in grades six through eight.

Royse City

“Through VLK|LAUNCH, a committee was formed to design this school that consisted of staff, parents, community members, and most importantly our students. The design is going to be safe, smart, modern, and efficient,” said Kevin Worthy, Superintendent, Royse City ISD. “From the secure interior courtyard, to the community friendly extracurricular facilities, we hope that it will spark creativity and passion for learning in every child.”

The new building is designed to promote outdoor engagement with a centrally located secure courtyard and large windows allowing day light throughout. The multipurpose courtyard area located just outside of the cafeteria functions as a staging area and will further serve as a meeting space for large events, classes, and play space. Multipurpose furniture will be placed on tracks that can be moved based on the space needed. The design is specified to be environmentally friendly by using a rainwater collection tank to further aid in landscaping.

Bobby Summers Middle School is expected to open its doors to students in August 2020.

Featured

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition