University of the Sciences Celebrates Grand Opening of Student Housing Complex

PHILADELPHIA, PA – Living & Learning Commons, a new residence hall at University of the Sciences in Philadelphia, opened this month. The 126,000-square-foot, 426-bed mixed use student housing complex will offer students on campus a place to sleep, study, and shop.

University of the Sciences student housing

The facility includes state-of-the-art classroom, retail, living, and learning spaces and sets the standards for dynamic living and learning communities for science and healthcare students. The construction has incorporated sustainable features to achieve Green Globe certification.

The Commons includes amenities such as double occupancy rooms with private bathrooms, smart laundry facilities on each floor, student lounge and study spaces, multi-use classrooms, and two retail spaces. One of the retail locations will house an ATI Physical Therapy clinic which will be open to the public. The second retail tenant has yet to be announced. 

The Harman Group provided structural engineering services for the project, working with developer Campus Apartments, and Baltimore-based architecture firm, Design Collective.

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.