UMPI Hosts Groundbreaking for Teaching and Research Greenhouse

PRESQUE ISLE, ME – The University of Maine at Presque Isle (UMPI) celebrated the forthcoming construction of its state-of-the art, four-season Teaching and Research Greenhouse with a Groundbreaking Ceremony on April 25. The greenhouse—a $935,000, 2,400-square-foot structure to be located close to the campus’s year-round composting site—will include two climate-controlled research labs, a teaching classroom, and a faculty office for the Dr. Robert Vinton Akeley, chair of Agricultural Science and Agribusiness.

University of Maine greenhouse

The greenhouse’s state-of-the-art design, by Dirigo Architectural Engineering of Turner, will maximize energy and operational efficiency. PNM Construction of Presque Isle will serve as general contractor on the project. Key features of the greenhouse include double layer polycarbonate transparent panels for the roof and walls, LED grow light systems, watering and ventilation systems—including destratification, exhaust, and circulation fans—and an advanced climate control system and sensor capacity. The technology will help support UMPI’s current research efforts such as disease management, soil fertility, and economic opportunities for Maine growers and agricultural producers.

The greenhouse will be used for various educational and research activities, including courses on plant biology, soil science, plant and crop science, and integrated pest management. Students will receive training in greenhouse crop production, sensor utilization, and analyzing remote monitoring, production, and energy cost data in order to develop a deeper understanding of greenhouse economics that they can bring into the workforce. Faculty will utilize the new facility to host professional development workshops for training in techniques such as seedling production and grafting, and collaborate with community and state partners such as the University of Maine Cooperative Extension, Maine Farm Bureau, Maine Organic Farmers and Gardeners Association, Future Farmers of America, Maine Farmland Trust, the Maine Potato Board, McCain Foods, and the Maine Sustainable Agriculture Association.

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition