$36M Athletics Complex Underway at Orange Coast College

COSTA MESA, CA – Groundbreaking recently took place on the $36 million Orange Coast College (OCC) Kinesiology and Athletics Complex in Costa Mesa, CA. The three-building, 88,000-square-foot complex is one part of a broader project to revitalize and modernize OCC’s campus.

Orange Coast College

Rendering courtesy of Little Diversified Architectural Consulting

Construction for the complex, by C. W. Driver, will occur in two phases. The first phase includes new construction of a multi-building, one-story complex spanning 58,000 square feet. Phase II will focus on the renovation of the existing 30,000-square-foot building that houses the men’s and women’s locker rooms and existing pool areas.

Upon delivery, the complex will feature division offices, athletic training, adaptive physical education, equipment management, locker rooms/showers, support spaces for the aquatics programs, a 65-meter competition pool with double bulkheads, a 25-meter instructional pool, and a 450-person bleacher space covered by a canopy. The buildings will be interconnected by an overhead shade structure.

Project partners include Little Diversified Architectural Consulting.

Featured

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.