Living Wall Graces University Atrium

atrium wall

The atrium of the Jack and Mary De Witt Center for Science and Technology at Cornerstone University in Grand Rapids, MI, features a thriving living wall.

The Jack and Mary De Witt Center for Science and Technology at Cornerstone University in Grand Rapids, MI, features a 374-square-foot green wall installed with the LiveWall Indoor Living Wall System. The $15.5-million facility is a three-story, 29,500-square-foot academic building that provides a new home for the university’s science, technology, engineering, and math (STEM) programs. The Center, opened in December 2018, includes seven labs, group study areas for collaborative learning, and faculty offices.

“The idea of a green wall came up during early brainstorming on design goals and approaches to constructing a building the reflects and incorporates natural elements of God’s creation,” says Bob Sack, vice president, advancement, Cornerstone University.

The Center’s living wall was installed with two separate LiveWall structures with shared infrastructure. They were assembled so that from most vantage points in the atrium the living wall appears to be one continuous wall that spans the second and third floors.

The living wall aids in providing passive biofilitration within the building. The LiveWall structural components were installed on steel studs anchored with standard fill plates two feet in front of a metal screen that covers the building’s main cold-air return. As indoor air returns to the HVAC system, the living material of the plants and growing medium filters the air and biologically degrades air pollutants.

“The engineering and flexibility of LiveWall made it the right choice for the project,” says John Haadsma, commercial landscape manager, Katerberg VerHage Inc. “Simple, minimal modifications to standard parts and installation techniques turned it into a passive bioflitration system without the expense of more complex and costly systems specially designed for this purpose.”

This article originally appeared in the College Planning & Management June 2019 issue of Spaces4Learning.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition