$6M Hillsboro (Ohio) High School Auditorium to Open Fall 2020

Hillsboro City Schools has contracted with Woolpert to provide full design services for its $6-million high school auditorium. The new auditorium will be 23,000 square feet, seat 800, and include flexible space for changing rooms and/or locker rooms.

Hillsboro High School, located about 60 miles east of Cincinnati, has an enrollment of approximately 750 students. Woolpert Project Manager Todd Ford, a 2002 Hillsboro graduate, said the design of the auditorium will mesh with the existing school and include technology and amenities specific to the school’s needs.

“There will be a 40-inch-high stage, which creates optimal viewing from all seats, LED lighting and acoustical design to ensure those on stage are properly seen and heard by the crowd,” Ford said. “Hillsboro will be one of the few schools in the area that can hold its entire school population in its auditorium, and we want to ensure they are served appropriately and effectively.”

The main entrance for the auditorium will be through the high school building, which Ford said will support safety and security for students and staff. The parking lot will be reconfigured to allow for this school expansion but retain the same amount of parking spaces.

Woolpert has performed a facility master plan, and Ford has performed multiple design projects at the high school. Ford said Woolpert’s acquisition of Waller, Todd & Sadler Architects in January has deepened and broadened Woolpert’s educational design capabilities.

“Waller, Todd & Sadler’s experience with K-12 and higher education facilities is nationally known and highly respected,” Ford said. “They know the ins and outs of high school auditoriums from ideal row breaks to ADA requirements to subsurface drainage to the pros and cons of orchestra pits. Their expertise is invaluable and will be well utilized for this and future projects.”

The Hillsboro High School auditorium project is in the design phase and is expected to go out to bid in August. Construction is scheduled to begin this fall, and the auditorium is projected to make its debut in the fall of 2020.

For more information, visit woolpert.com.

Featured

  • concentric silhouettes of a human head

    How Physical Space Shapes the Mind: Designing for Better Learning Outcomes

    Research in environmental psychology and neuroscience increasingly suggests that the way a room is designed can influence memory, focus, or even a student's sense of belonging.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

Digital Edition