Hildreth Elementary School Construction Begins

Boston-based architecture and design firm, Arrowstreet recently joined the Town of Harvard, the Massachusetts School Building Authority (MSBA), and State Senator Jamie Eldridge, as well as school board and school building committee members, teachers, students and families to celebrate the groundbreaking of Hildreth Elementary School in Harvard, Mass.

Arrowstreet Hildreth Learning Stair

When completed in 2021, the new 85,200-square-foot, PK-5 school will be home to a 21st-century learning environment that meets the educational vision of this high-performing school district while also respecting the character and values of the town. The new school will include:

  • 25 core classrooms for Grades PK-5 with flexible learning spaces that accommodate large group, small group, and individual learning needs
  • An Innovation Lab to facilitate Science Technology Engineering and Math (STEM) learning
  • Cafeteria, media center, and gymnasium designed to create a strong sense of community
  • District offices for the superintendent and other administrative support staff,
  • And site improvements that include playgrounds and playing fields, improved bus and vehicle circulation and parking, and storm water mitigation measures.

The new building design represents a two-year process of working with administrators, faculty and staff, and community members to define the educational program and design the building to suit the district’s high-performing approach to learning. 

“From the onset of this project, it has been clear to us what a wonderful community Harvard is, and the town’s impressive commitment to education and creating a sense of place,” said Larry Spang, principal at Arrowstreet, who leads the firm’s schools practice. “Inspired by Harvard, we designed the new school with three core goals: create educational spaces to support the today’s learning styles in support of the community’s commitment to education; design the building to enhance the existing context of historic Harvard; and create a sense of community. We look forward to two years from now when students and teachers open the doors to the school that they envisioned.”

“Today is big day for the town of Harvard. A lot of hard work and dedication to providing high quality education went into making our vision for this school a reality. We owe thanks to the generosity of the many volunteers and the taxpayers who made this project possible. The new school will add value to our community and help prepare the next generation in a beautiful, engaging and sustainable building,” said the School Building Committee Chair Susan Mary Redinger.

Featured

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Armstrong World Industries Acquires Parallel Architectural Products

    Armstrong World Industries, provider of interior and exterior architectural applications, recently announced that it has acquired the Colorado-based Parallel Architectural Products, according to a news release.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.