Carnegie Mellon University: Sorrell's Engineering & Science Library Renovation

Carnegie Mellon University 

PHOTOS © ED MASSERY

A minimally disruptive renovation has transformed the Sorrell’s Engineering & Science Library at Carnegie Mellon University in Pittsburgh into a learning hub for 21stcentury students.

Three prefabricated bamboo elements are at the heart of this renovation. Designed by GBBN and fabricated locally by two Carnegie Mellon School of Architecture alums, these striking millwork pieces bring warmth to a concrete Brutalist building and help turn it into a place for active learning. Because the space now offers students a wide variety of ways to study and learn, they’re empowered to choose the zone that best suits their project needs and study style.

Near the entrance of the 16,000-square-foot space, “arbors” bring down the scale and provide collaborative zones that feel sheltered within an active, social area. A “portal” in the middle separates the active space near the entry and circulation desk from quiet and focused work zones toward the back. The portal also offers students a range of alternative seating on and around its platform. A multimedia collaborative “den” at the back of the library lets larger groups work without disrupting others.

Additionally, prefabricated glass and metal modular work rooms were added to the space. They keep students visually connected to the rest of the library but provide acoustic privacy for group projects.

All four elements were fabricated offsite and installed in just two weeks during a campus break. To accommodate these changes, a large number of little-used books were moved off-site while 12,000 of the most frequently requested titles remain.

This article originally appeared in the College Planning & Management July/August 2019 issue of Spaces4Learning.

Featured

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

Digital Edition