Carnegie Mellon University: Sorrell's Engineering & Science Library Renovation

Carnegie Mellon University 

PHOTOS © ED MASSERY

A minimally disruptive renovation has transformed the Sorrell’s Engineering & Science Library at Carnegie Mellon University in Pittsburgh into a learning hub for 21stcentury students.

Three prefabricated bamboo elements are at the heart of this renovation. Designed by GBBN and fabricated locally by two Carnegie Mellon School of Architecture alums, these striking millwork pieces bring warmth to a concrete Brutalist building and help turn it into a place for active learning. Because the space now offers students a wide variety of ways to study and learn, they’re empowered to choose the zone that best suits their project needs and study style.

Near the entrance of the 16,000-square-foot space, “arbors” bring down the scale and provide collaborative zones that feel sheltered within an active, social area. A “portal” in the middle separates the active space near the entry and circulation desk from quiet and focused work zones toward the back. The portal also offers students a range of alternative seating on and around its platform. A multimedia collaborative “den” at the back of the library lets larger groups work without disrupting others.

Additionally, prefabricated glass and metal modular work rooms were added to the space. They keep students visually connected to the rest of the library but provide acoustic privacy for group projects.

All four elements were fabricated offsite and installed in just two weeks during a campus break. To accommodate these changes, a large number of little-used books were moved off-site while 12,000 of the most frequently requested titles remain.

This article originally appeared in the College Planning & Management July/August 2019 issue of Spaces4Learning.

Featured

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.