7 C Strategy for Cost-Effective Preventative Maintenance

Preventative maintenance is crucial for identifying maintenance needs and determining the amount of deferred maintenance needed. It will also help facility managers plan and prioritize projects and evaluate their costs.

“Cost-effective,” “preventative,” and “maintenance” are all common buzzwords used in the construction industry, and while the terminology is understood, few really understand how to make “cost-effective preventative maintenance” a reality for their facility.

Preventative maintenance activities are primarily condition-based. Cost-effective preventative maintenance is a fluid process that can have a huge impact on a property’s bottom line… if done properly. Created by Western Specialty Contractors, this “7 C Strategy for Cost-Effective Preventative Maintenance” list will help building owners and facility managers understand and put into practice a cost-effective preventative maintenance plan of their own.

Components and Conditions

A preventative maintenance program begins with making a list of a facility’s different components and gathering basic information on each of their conditions. Collecting this information is crucial for identifying maintenance needs and determining the amount of deferred maintenance needed. It will also help facility managers plan and prioritize projects and evaluate their costs. Tips for compiling the list include:

  • Keep an accurate building component inventory
  • Make a plan for performing a condition assessment
  • Conduct the assessment methodically
  • Assign condition ratings for each component
  • Decide on a regular frequency for assessments

Capacity and Costs

Preventative maintenance isn’t about big budgets or how much money is spent. To be cost-effective, it’s all about how the money is spent. Facility managers are encouraged to make a plan that targets their resources towards the highest needs.

To make a great plan, facility managers need to develop the capacity for ranking maintenance projects and evaluating their costs by doing the following:

  • Recognize that not all projects share the same importance
  • Use an objective process for prioritizing projects
  • Use life-cycle costing and other tools to evaluate total costs

Coordinate

When facility managers don’t have a plan, maintenance tends to be reactive instead of proactive. In other words, maintenance only happens when the need occurs, which typically results in higher repair costs and inconvenience. Coordinating long- and short-term maintenance plans together will help facility managers avoid costly reactive maintenance. Coordination includes:
  • Develop a long-term plan
  • Develop a capital improvement program
  • Establish a reserve account for maintenance
  • Develop an annual work plan
  • Link the annual work plan with the annual budget

Checklists

Once an assessment and inventory of all components have been made, the projects have been prioritized, and their costs have been evaluated, now is the time to make checklists and mini-frameworks for staff to execute the maintenance plan. Start by doing the following:

  • Develop checklists of tasks
  • Determine the frequency for tasks
  • Link preventative maintenance with everyday tasks
  • Schedule a timeline
  • Prepare procedures for managing the program

Contractors

No matter what the quality, performance characteristics, and cost of a material or system, each of these is only as effective as the caliber of its installation. Even the best systems may prove worthless or ineffective if not installed and transitioned properly. Improper installation can lead to structural and interior damage that could result in lost revenue for the building owner.

A critical aspect is contractors. It’s not about finding the one with the cheapest estimate; it’s about finding the right contractor for the project. The right contractor will make any project a lot less stressful. When selecting a contractor, consider the following:

  • Make a thorough review of whether they have the right experience and skills for the project
  • Determine whether they have proper fiscal responsibility to complete the project and honor the punch list
  • Create a qualification statement to pre-qualify contractors for projects

With these 7 Cs in place, the practice of preventative maintenance will offer your campus many important benefits, the most important of which is that it can improve your bottom line.

About the Author

Western Specialty Contractors (www.westernspecialtycontractors.com), based in St. Louis, MO, is the nation's largest specialty contractor in masonry and concrete restoration, waterproofing, and specialty roofing.

Featured

  • Esports are Growing in Popularity

    Video games and esports are a popular social hobby, and it’s one that’s accessible to a wide variety of physical ability levels. Some esport student-athletes have started to earn scholarship opportunities, and high schools are beginning to form teams equipped with the same degree of resources as their physical sports teams. However, the two have very different needs.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.