New Arizona High School Follows Academy Model

A high school scheduled to open this month near Phoenix in Arizona is following what it's calling an "academy-based, career-pathway focused education." Eastmark High School, part of the Queen Creek Unified School District in Mesa, will feature next-generation educational spaces as well as athletic and arts programs.

The campus is being built with a combination of voter-approved bond funds and state school facilities funding. Phase-1 of the project is 154,000 square feet with a capacity for about 1,350 students. The site is master planned for future phases to increase capacity to 2,700 to 2,800 students. The future spaces will accommodate an auxiliary gym, additional learning spaces, a performing and arts space and an auditorium.

The project broke ground in March 2018 on a 60-acre site. Orcutt | Winslow designed the high school, which is being built by Core Construction. According to local media coverage, the construction company used virtual reality technology to enable stakeholders to see what the new school would look like.

Students will attend classes within one of four distinct academies: STEM, medical and social health, business and marketing, and fine arts.

What's unique is that each academy will have its own space, which mimics what students would experience in the real world. As Principal Paul Gagnon explained in a video, the business and marketing students will be able to run a student store where they'll be able to market their materials. The fine arts students will work in an environment set up like a film and TV studio. The medical students will study in a space that mimics a hospital setting. And the STEM students will be "in an engineering lab where they can build things just like they would in any robotics-type setting."

As the academies grow, each will have dedicated specialists to serve as guidance counselors. Currently, the school is also seeking professional partnerships "so that our students can truly learn from the people that are doing the work out in the field and have access to that knowledge to make them more successful and more prepared for the future," said Gagnon.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition