High School District to Pump $600k into Smarter Surveillance System

The board of a California school system has approved funding to replace legacy security camera gear. West Sonoma County Union High School District awarded the $602,948 contract to Integrated Security Controls, a regional solution provider.

According to local reporting, the Santa Rosa company will be installing 96 cameras at three high schools, Analy, El Molino and Laguna, as well as software with analytics that will enable administrators to view what's happening at their schools.

During the meeting where the approval was given, facilities manager Jennie Bruneman told the board that the previous camera system was "very difficult to use," forcing users to manually look through footage to find what they needed. With the new equipment, users will be able to search on specific details — "a student wearing a ball cap and a red shirt" — and the analytics will identify that individual as he or she moves around the campus.

The Integrated Security solution was chosen after a pilot project that tested two companies' systems. The specific equipment being installed comes from Avigilon, a Motorola Solutions company.

The camera installation is expected to be done by the end of September, Bruneman told the board.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Georgia State University Opens New Research Tower

    Georgia State University in Atlanta, Ga., recently held a ribbon-cutting ceremony for a new, nine-story, 155,000-square-foot Research Tower, according to university news. Amenities include academic classrooms, a large lecture space, teaching labs, faculty research space, and the uppermost floors reserved for future expansion.