Floor Raceway System Wrangles Wayward Wires

A company that makes hardware for managing tech infrastructure has released a new solution for organizing messy cables and wires. The "Smart-Way On-Floor Raceway System" from FSR installs on top of flooring to take the place of having to build a subfloor to accommodate wiring.

It's sold in 6-foot sections and provides three separate compartments in its track: two for power lines and another for data and AV lines. The design includes centering V-grooves in the track to help locate pilot/clearance holes for securing fasteners.

The Smart-Way is a half-inch high, ADA compliant and available in slate-gray or aluminum finishes. It's sold in 6-foot sections and provides three separate compartments in its track: two for power lines and another for data and AV lines. The design includes centering V-grooves in the track to help locate pilot/clearance holes for securing fasteners. An elbow kit enables the installer to make 45 or 90-degree angles that minimize the bend radius of wire.

An elbow kit enables the installer to make 45 or 90-degree angles that minimize the bend radius of wire.

Suggested pricing is set at $230 for each segment and $125 for corners.

"It's a very small, unobtrusive bump in the floor," said Chaz Porter, the company's sales director, in a video about the product.

The system is expected to begin shipping in mid-August.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.