Pennsylvania SD Adds Bullet-Resistant Glass to New School Plans

The Wilkes-Barre Area School District approved an upgrade to safety measures for a new high school still under construction. The school board voted to add bullet-resistant glass along the building’s perimeter and in the school’s entryway. The glass adds a $460,000 cost to the project and will be installed by Sterling Glass.

"Unfortunately, this — school shootings, and active shootings, shooters — [is] something we have to contend with and deal with, and this is a measure we can take to try to make those kids as safe as possible," Shawn Walker, vice president of the Wilkes-Barre Area School Board, told a local news reporter.

The total budget for the project is $121 million and includes $7 million for contingent expenses. The new school will combine the district’s three high schools into one.

Construction for the new high school began earlier this year and is expected to be completed in 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition