Pennsylvania SD Adds Bullet-Resistant Glass to New School Plans

The Wilkes-Barre Area School District approved an upgrade to safety measures for a new high school still under construction. The school board voted to add bullet-resistant glass along the building’s perimeter and in the school’s entryway. The glass adds a $460,000 cost to the project and will be installed by Sterling Glass.

"Unfortunately, this — school shootings, and active shootings, shooters — [is] something we have to contend with and deal with, and this is a measure we can take to try to make those kids as safe as possible," Shawn Walker, vice president of the Wilkes-Barre Area School Board, told a local news reporter.

The total budget for the project is $121 million and includes $7 million for contingent expenses. The new school will combine the district’s three high schools into one.

Construction for the new high school began earlier this year and is expected to be completed in 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • A digital silhouette works at a computer, immersed in a glowing, interconnected world

    How Will AI Transform Learning Space Design?

    For years, higher education has designed learning spaces around technology as a tool for display, capture, collaboration, and connectivity. AI changes that equation.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.