Madison SD Installs Electronic Door Locks, Internet-Based Phones to Enhance Safety

Madison Metropolitan School District installed electronic locks and internet-based phones with increased functionality as part of an upgraded district-wide security plan.

The $6.5 million security plan was partially funded by a grant program the Wisconsin state government established last year in a response to a mass shooting at a Florida High school. Madison was awarded $1 million in the first round of funding and $1.5 million in the second round. The rest of the plan was covered by local funds.

More than 4,600 locks have been swapped out across the district. The electronic locks — which are controlled by staff ID badges — automatically locks people from coming in a room once the door is closed, unless they have a badge.

About 4,100 new phones have been put in all schools but the software that increases the phone’s capabilities will be installed throughout the fall semester. Once added, the phones will be able to page an individual classroom through the PA system and send out emergency notifications to families.

“This new phone system gives us a ton of flexibility and functionality because it is run over the internet,” director of building services, Chad Wiese told a local newspaper.

In addition, the school district is adding more than 400 cameras and window-hardening film to main entrances of schools, designed to slow down active shooters.

In order to receive the grant funding from the state, teachers needed to complete associated safety training. The district also trained staff and teachers on new standardized emergency response procedures.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Philadelphia Middle School Facility Earns LEED Gold Certification

    The Alternative Middle Years (AMY) at James Martin Middle School in Philadelphia, Penn., recently received a LEED Gold certification from the U.S. Green Building Council, according to a news release. The School District of Pennsylvania partnered with KSS Architects on the project.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.