University of Iowa College of Nursing Celebrates Completion of Renovated Building

IOWA CITY, IA – The University of Iowa College of Nursing is celebrating the completion of a major renovation project to modernize teaching spaces and create more interactive and collaborative spaces in which its students can learn.

The 35,377-square-foot renovation project began in 2017 and included the ground floor, first floor, half of the second floor, and parts of the third and fourth floors. The project was completed over the summer.

University of Iowa Nursing School

The original building was constructed in 1971 on the west side of campus. The renovation respected the existing architecture of the building while updating finishes and spaces to make it more welcoming, collaborative, and open.

The ground level now houses four new general assignment classrooms, both traditional and active-learning format. The first level houses the student services and diversity departments, along with a board room, student commons area, and Student Success Center offices. The second level includes administrative offices, conference and collaboration areas, and classrooms. The third and fourth levels house additional office and classroom space.

Featured

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.