University of Iowa College of Nursing Celebrates Completion of Renovated Building

IOWA CITY, IA – The University of Iowa College of Nursing is celebrating the completion of a major renovation project to modernize teaching spaces and create more interactive and collaborative spaces in which its students can learn.

The 35,377-square-foot renovation project began in 2017 and included the ground floor, first floor, half of the second floor, and parts of the third and fourth floors. The project was completed over the summer.

University of Iowa Nursing School

The original building was constructed in 1971 on the west side of campus. The renovation respected the existing architecture of the building while updating finishes and spaces to make it more welcoming, collaborative, and open.

The ground level now houses four new general assignment classrooms, both traditional and active-learning format. The first level houses the student services and diversity departments, along with a board room, student commons area, and Student Success Center offices. The second level includes administrative offices, conference and collaboration areas, and classrooms. The third and fourth levels house additional office and classroom space.

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition