University of Iowa College of Nursing Celebrates Completion of Renovated Building

IOWA CITY, IA – The University of Iowa College of Nursing is celebrating the completion of a major renovation project to modernize teaching spaces and create more interactive and collaborative spaces in which its students can learn.

The 35,377-square-foot renovation project began in 2017 and included the ground floor, first floor, half of the second floor, and parts of the third and fourth floors. The project was completed over the summer.

University of Iowa Nursing School

The original building was constructed in 1971 on the west side of campus. The renovation respected the existing architecture of the building while updating finishes and spaces to make it more welcoming, collaborative, and open.

The ground level now houses four new general assignment classrooms, both traditional and active-learning format. The first level houses the student services and diversity departments, along with a board room, student commons area, and Student Success Center offices. The second level includes administrative offices, conference and collaboration areas, and classrooms. The third and fourth levels house additional office and classroom space.

Featured

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars