Why should we install waterless urinals?

Determining the need for waterless urinals depends on the number of males using the building. Also, if new construction or a restroom renovation is involved. If new construction, there are few reasons not to install no-water urinals. If a retrofit, and 10 or fewer males use the facility, the return on the investment may not prove worthwhile at this time. But with rising water and sewer rates, reconsideration may be necessary at a future date.

When looking at installation and maintenance costs, no-water urinals usually cost less to install than traditional fixtures because no flush valves or water lines are involved. Overall, the return on investment can vary, depending on the number of users, water and sewer rates, and the age of the urinals. Waterless urinals range in price from $250 to $500 per unit. In most cases, the return on investment is about two years or less.

If you are concerned with odor issues, most waterless urinals have cartridges installed in the base of the fixture. Filled with barrier fluids, these cylinders suppress odors and block vapors. Proper cleaning will help prevent odors. Be aware that some cartridges are costly and must be replaced fairly often, but others are relatively inexpensive and last longer. Investigate the different systems available before selecting your waterless urinals.

Also, if sustainability is an objective, installing waterless urinals can earn you LEED points. The LEED rating system offers up to five points (out of approximately 32 required) toward certification for buildings that incorporate measures to reduce water usage. Installing waterless urinals is often one of the easiest and most significant ways to accomplish this.

This article originally appeared in the College Planning & Management October 2019 issue of Spaces4Learning.

About the Author

A frequent speaker and author on water conservation issues, Klaus Reichardt is founder and CEO of Waterless Co. Inc.(www.waterless.com), based in Vista, CA. Reichardt founded the company in 1991 with the goal to establish a new market segment in the plumbing fixture industry with water efficiency in mind. The company manufactures restroom and plumbing-related products.

Featured

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • Boosting Student Wellness and Safety Through Indoor-Outdoor School Spaces

    Engaging students through facilities designed for indoor and outdoor learning and activities reflects a growing awareness of how children learn and thrive, with educators recognizing the importance of getting outside and disconnecting from technology. And, as today’s youth grapple with the urgent mental health crisis of increased anxiety and loneliness fueled by both the pandemic and technology, along with a related crisis in youth physical health, the wellness benefits of getting outside have never been so palpable.

  • Thomas F. Frist, Jr. College of Medicine

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Thomas F. Frist, Jr. College of Medicine has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

Digital Edition