HSB Launches New IoT Solution for Schools

Hartford Steam Boiler, part of Munich Re, announced a new customized IoT solution for schools to protect buildings and equipment against water leaks, freezing pipes, mold and perishable goods spoilage.

HSB Connected Technologies will monitor buildings and equipment 24/7 and alert school officials immediately of any potential risks. School officials will be able to check on conditions in gyms, locker rooms, offices and other spaces on campus with the use of a mobile app.

“We think of schools as bustling with students, teachers and activity,” said Jack Volinski, HSB senior vice president in a press release.  “But what about when the school is empty?  Perhaps at night, on a holiday weekend, or winter and summer breaks?  Our IoT solution monitors property and equipment risks and sends an alert to proactively mitigate damages that traditional building management systems cannot prevent.”

HSB’s new school solution is powered by advanced algorithms that consider multiple risk factors. The IoT sensors use the latest LoRaWAN® network protocols to provide long range and strong signal strength across school buildings.

The IoT solution is available through school risk pools and property-casualty insurance companies that partner with HSB.

Learn more at hsbconnectedtechnologies.com

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition