New Texas High School Faces Rising Construction Costs

Construction on Frisco ISD’s newest high school began this summer amidst rising costs of building materials and labor shortages. These challenges led to a $13 million project increase for the newly named Emerson High School, putting the total to about $111.6 million, reported the Dallas Morning News.

Various factors contributed to the higher price tag of the school but one of the greatest factors is the state’s worker shortage due to immigration policies and lack of specialized workers. A recent survey from the Associated General Contractors of America found that about 80 percent of contractors nationwide reported difficulties finding craft workers to hire.

In addition, immigrants make up nearly half of the Dallas area’s jobs in construction, according to a new study by the New American Economy. But latest immigration policies have contributed to a shortage of workers. Due to Frisco’s rapid growth, the school has had to compete for workers against other construction industries.

The rising cost of materials, like lumber and steel, impacted the 14 percent increase of the school as well, a spokeswoman for Frisco ISD told Dallas Morning News. The district also tacked on about $4 million worth of additional features that weren’t in the original school plans, including synthetic turf athletic fields, a paved marching band field and security features.

Emerson High School is funded through the 2014 bond program and set to be completed in 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • CSU Starts Construction on New Engineering Building

    Colorado State University in Denver, Colo., recently began clearing space for the construction of the new Don and Susie Law Engineering Future Technologies Building, according to a news release.

  • Barbara Vick Western Branch

    Barbara Vick Western Branch

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Barbara Vick Western Branch has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.