Encinitas Middle School's STEM Building Nearly Complete

Diegueño Middle School in Encinitas, California will soon have a new classroom building with ample space for hands-on STEM learning, reported the Encinitas Advocate.

San Dieguito Union High School District has replaced a 35-year-old building with a new building featuring four large general-purpose classrooms, a new computer lab and a makerspace.

The new 1,100-square-foot computer lab can accommodate 38 students with room to spread out. The makerspace includes a polished floor, retractable extension cord wheelset built into the ceiling and a roll-up door for access to an outdoor patio.  

The front of the building will include seating walls, gathering spaces for students, new landscaping and trees.

The building is expected to be completed this fall with students utilizing the building after the winter break.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • R.I. District Holds Ribbon-Cutting Ceremony for New Elementary School

    Cranston Public Schools in Cranston, R.I., recently announced the completion of Gladstone Elementary School, according to a news release. The 100,000-square-foot facility serves as a replacement for the 1950s-era former building, and it consolidates the student, faculty, and staff populations of Gladstone and Arlington Elementary Schools.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.