Encinitas Middle School's STEM Building Nearly Complete

Diegueño Middle School in Encinitas, California will soon have a new classroom building with ample space for hands-on STEM learning, reported the Encinitas Advocate.

San Dieguito Union High School District has replaced a 35-year-old building with a new building featuring four large general-purpose classrooms, a new computer lab and a makerspace.

The new 1,100-square-foot computer lab can accommodate 38 students with room to spread out. The makerspace includes a polished floor, retractable extension cord wheelset built into the ceiling and a roll-up door for access to an outdoor patio.  

The front of the building will include seating walls, gathering spaces for students, new landscaping and trees.

The building is expected to be completed this fall with students utilizing the building after the winter break.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • University of Kentucky Receives $150M Gift Toward New Arts District

    The University of Kentucky’s Board of Trustees recently received a $150-million gift from The Bill Gatton Foundation, according to a university news release, to build a new arts district on the campus in Lexington, Ky. The new district will feature a new College of Fine Arts building and a multi-hundred-seat theater, among other amenities.

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.