Innovative Boston School Officially Opens in North End

The Eliot Innovation School celebrated the construction of a new, waterfront upper campus with a ribbon cutting ceremony on Oct. 19, attended by Mayor Martin Walsh, Boston Public Schools (BPS) Superintendent Brenda Cassellius, city officials, BPS staff and the community. The $15 million building renovation was part of Mayor Walsh’s $2.08 billion Imagine Boston Capital Plan. It was the final phase of an overall $33 million project to two Eliot school buildings.

The $15 million building renovation was part of Mayor Walsh’s $2.08 billion Imagine Boston Capital Plan. It was the final phase of an overall $33 million project to two Eliot school buildings.

Finegold Alexander Architects served as the architect, Daniel O’Connell’s Sons were the contractor for the project and design and construction was managed by the City of Boston Public Facilities Department.

The 42,000-square-foot facility is the latest addition to Eliot’s three-campus school. One location serves grades K0-1, another serves grades 2-4 and the new school serves about 400 students in grades 5-8.

Transformed from an office building, the school includes 18 light-filled classrooms; collaborative learning spaces; media, arts and tech/robotics spaces on the first floor; and multi-purpose spaces for community meetings. A new exterior play space is accessible to the community.

Transformed from an office building, the school includes 18 light-filled classrooms; collaborative learning spaces; media, arts and tech/robotics spaces on the first floor; and multi-purpose spaces for community meetings.

The school features systems that promote sustainability and resiliency, which include:

  • A reflective roof;
  • High R-value building envelope;
  • A storm water retention system;
  • High performance glazing that maximizes natural light;
  • LED lighting with daylight and motion sensors;
  • Low-flow plumbing fixtures; and
  • High-efficiency boilers.

The waterfront location connects students to their natural and historical environment, with access to views to the Boston Harbor and the Freedom Trail just a short walk away.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.