New Missouri Elementary Features Collaborative Spaces for Each Grade Level

Renderings and floor plans of a new elementary school were shared in the last Washington School District board meeting. The new, two-story elementary school will replace South Point Elementary and is funded by Prop S, a $26 million bond issue approved in April.

Bond Architects and Washington Engineering gave a presentation to board members on the project. The 78,000-square-foot building will be “angular with both rustic and industrial flair inside and out featuring a dynamic color scheme,” Superintendent Dr. Lori VanLeer, told a local newspaper. The school will feature collaborative spaces for each grade level with books available to check out in each space in addition to a library/makerspace with space for full class instruction and room to build projects.

Classrooms for kindergarten through second grade will be on the first floor with third through sixth grade on the second level. The gym, located on the main floor in the center of the building, will also be a storm shelter with adjacent bathrooms and a backup generator.

Construction bids will go out in early January and a contract will be awarded in late January or early February with construction beginning in the spring of 2020.

The new school is estimated to cost $23 to $24 million and slated to open in August 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Clearing the Air: H2M Busts Common AC/HVAC Myths

    When it comes to keeping school facilities comfortable and energy-efficient, there’s no shortage of heating, ventilation, and air conditioning (HVAC) advice circulating online or from well-intentioned neighbors. There are also many myths surrounding the negative impact AC/HVAC systems can have on school buildings.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • California High School Completes Construction on New Makerspace Facility

    Lynbrook High School, part of the Fremont Union High School District (FUHSD) in San Jose, Calif., recently held a ribbon-cutting ceremony for a new Makerspace Building, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the building’s design and Blach Construction for building services.