TAMU Plant Pathology and Microbiology Building Opens

COLLEGE STATION, TX – An initiative begun during the 2012-2013 academic year led Texas A&M University’s (TAMU) College of Agriculture and Life Sciences to declare five grand challenges of agriculture. Three of those—“Feeding Our World,” “Improving Our Health,” and “Protecting Our Environment”—were specifically called out by Sandy Pierson, professor and head of the Department of Plant Pathology and Microbiology, during the groundbreaking ceremony for the Plant Pathology and Microbiology Building two years ago. Now, with the building’s official grand opening in late October, the department can enhance its collaborative efforts with the Institute for Plant Genomics and Biotechnology (IPGB) and other College of Agriculture and Life Sciences departments, including Entomology, Horticulture, Soil and Crop Sciences, Biochemistry and Biophysics, Ecosystem Sciences and Management, and Wildlife and Fishery Sciences.

Texas A&M Plant Pathology 200

The new building provides generic, flexible labs with the capabilities necessary to support research as it evolves. Its 84,000 square feet includes two plant pathology instructional labs, one bio-environmental instructional lab, teaching support spaces, 20 general research spaces with associated support areas, an integral greenhouse, two multipurpose seminar rooms, one multipurpose flat-floor auditorium, and administrative offices. Its placement adjacent to the Horticulture/Forest Science Building, and near other related research departments and facilities, strengthens and enhances opportunities for cross-disciplinary collaboration among faculty and students.

The building, which will serve as the new home of the Department of Plant Pathology and Microbiology as well as the Bioenvironmental Sciences (BESC) program, was planned and designed by Flad Architects in collaboration with architect of record Randall Scott Architects.

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition