Renovation Complete on Macalester College’s Janet Wallace Fine Arts Center

MINNEAPOLIS, MN – A long-term renovation of Macalester College’s Janet Wallace Fine Arts Center (JWFAC) in St. Paul, MN, is now complete. Placing the values of a liberal arts education at the forefront of its master planning process, HGA, a national multi-disciplinary design firm, completed the last phase housing the Theater and Dance department in the spring of 2019. The Arts Center is part of a wider educational movement across campuses today, in which arts facilities help shape social change and inspire students.

Macalester’s new Theater and Dance department is located in the center of its beautiful urban campus. HGA revitalized the facility’s connectivity within departments and to the campus itself, ushering in a new wave of creativity and collaboration for students and faculty.

Macalaster College Fine Arts Center

Photo © Corey Gaffer Photography

The JWFAC is designed with an outward expression that integrates the three phases (music, visual arts, theater and dance), giving each a distinct yet unified identity. Each phase includes a featured façade with custom architectural expression related to the arts discipline within. The entry of the Theater and Dance building, for instance, features a flowing, perforated, custom-metal scrim façade that is internally lit, alluding to the movement, fabric, and theatricality of the performing arts.

The finale of this three-phase, four building project included demolishing the original 1965 Theater and Dance wing, and replacing it with a new three-level building. To foster interdisciplinary collaboration, the new plan takes advantage of adjacencies to existing resources within the complex, including the Mairs Concert Hall, the Law Warschaw Gallery and the Lowe Dayton Arts Commons.

Featured

  • New Jersey Day School Opens New Science & Entrepreneurship Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently celebrated the grand opening of the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIG Architecture on the 32,000 square foot facility, completed on a 17-month construction timeline in time for the beginning of the new school year.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.