Tips for Custodial Workers and Employers

Below are a few guidelines from the CDC when cleaning and disinfecting facilities. For more information, visit cdc.gov/coronavirus.

When Cleaning

  • Wear disposable gloves and gowns for all cleaning, including handling trash.
    • All personal protective equipment (PPE) should be removed carefully to avoid contamination of the wearer and the surrounding area.
  • Wash hands often with soap and water for 20 seconds.
    • Always wash hands immediately after removing gloves.
    • In addition, wash hands immediately after blowing one’s nose, coughing, or sneezing; after using the restroom; and before eating or preparing food.

Additional Considerations for Employers

  • Educate custodial workers to recognize the symptoms of COVID-19.
  • Provide instructions on what to do if workers develop symptoms within 14 days after their last possible exposure to the virus.
  • Develop policies for worker protection and provide training to all cleaning staff on site prior to providing cleaning tasks. Training should include when to use PPE, what PPE is necessary, how to properly put on, use and take off PPE, and how to properly dispose of PPE.

This article originally appeared in the March/April 2020 issue of Spaces4Learning.

Featured

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.