Tips for Custodial Workers and Employers

Below are a few guidelines from the CDC when cleaning and disinfecting facilities. For more information, visit cdc.gov/coronavirus.

When Cleaning

  • Wear disposable gloves and gowns for all cleaning, including handling trash.
    • All personal protective equipment (PPE) should be removed carefully to avoid contamination of the wearer and the surrounding area.
  • Wash hands often with soap and water for 20 seconds.
    • Always wash hands immediately after removing gloves.
    • In addition, wash hands immediately after blowing one’s nose, coughing, or sneezing; after using the restroom; and before eating or preparing food.

Additional Considerations for Employers

  • Educate custodial workers to recognize the symptoms of COVID-19.
  • Provide instructions on what to do if workers develop symptoms within 14 days after their last possible exposure to the virus.
  • Develop policies for worker protection and provide training to all cleaning staff on site prior to providing cleaning tasks. Training should include when to use PPE, what PPE is necessary, how to properly put on, use and take off PPE, and how to properly dispose of PPE.

This article originally appeared in the March/April 2020 issue of Spaces4Learning.

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.