East Central Community College Opens Football Operations Center

DECATUR, MS – East Central Community College recently officially opened its new Warrior Hall football operations center the campus in Decatur, MS. The $2.6-million, 12,300-square-foot facility is located just outside the north end zone of Warrior Field at Bailey Stadium.

Warrior Hall at East Central Community College

Warrior Hall contains locker rooms for players and for coaches, a team meeting room, position conference rooms, coaches’ offices, an equipment room, a players’ lounge and a laundry room. It also houses a state-of-the-art training room with hydrotherapy pool to be used by student-athletes in all nine varsity sports at the college.

Offices, conference rooms, meeting rooms, the Hall of Champions, the locker room and individual lockers, the equipment room, the training room, the hydrotherapy pool, the coaches’ locker room and the main team meeting room and the chairs in that room were among the items in Warrior Hall sponsored by donors.

The architect for Warrior Hall was Eley Guild Hardy Architects of Biloxi. The contractor was J&J Contractors Inc. of Collinsville.

Featured

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.