East Central Community College Opens Football Operations Center

DECATUR, MS – East Central Community College recently officially opened its new Warrior Hall football operations center the campus in Decatur, MS. The $2.6-million, 12,300-square-foot facility is located just outside the north end zone of Warrior Field at Bailey Stadium.

Warrior Hall at East Central Community College

Warrior Hall contains locker rooms for players and for coaches, a team meeting room, position conference rooms, coaches’ offices, an equipment room, a players’ lounge and a laundry room. It also houses a state-of-the-art training room with hydrotherapy pool to be used by student-athletes in all nine varsity sports at the college.

Offices, conference rooms, meeting rooms, the Hall of Champions, the locker room and individual lockers, the equipment room, the training room, the hydrotherapy pool, the coaches’ locker room and the main team meeting room and the chairs in that room were among the items in Warrior Hall sponsored by donors.

The architect for Warrior Hall was Eley Guild Hardy Architects of Biloxi. The contractor was J&J Contractors Inc. of Collinsville.

Featured

  • Photo courtesy of Kraus-Anderson

    Concordia College Completes Memorial Auditorium Renovations

    Concordia College in Moorhead, Minn., recently completed a $2.5-million renovation project to Memorial Auditorium, a news release reports. The college partnered with Kraus-Anderson for the project’s construction and ICON Architectural Group for its design.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.