East Central Community College Opens Football Operations Center

DECATUR, MS – East Central Community College recently officially opened its new Warrior Hall football operations center the campus in Decatur, MS. The $2.6-million, 12,300-square-foot facility is located just outside the north end zone of Warrior Field at Bailey Stadium.

Warrior Hall at East Central Community College

Warrior Hall contains locker rooms for players and for coaches, a team meeting room, position conference rooms, coaches’ offices, an equipment room, a players’ lounge and a laundry room. It also houses a state-of-the-art training room with hydrotherapy pool to be used by student-athletes in all nine varsity sports at the college.

Offices, conference rooms, meeting rooms, the Hall of Champions, the locker room and individual lockers, the equipment room, the training room, the hydrotherapy pool, the coaches’ locker room and the main team meeting room and the chairs in that room were among the items in Warrior Hall sponsored by donors.

The architect for Warrior Hall was Eley Guild Hardy Architects of Biloxi. The contractor was J&J Contractors Inc. of Collinsville.

Featured

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.