"Viral Barrier" Provides Physical Distancing Shield

A U.S.-based company has launched a new line of mobile panels meant to provide shields for people. "ViralBarrier" from Precise Tooling Solutions is intended specifically for K-12 and higher education use.

"ViralBarrier" from Precise Tooling Solutions is intended specifically for K-12 and higher education use.

According to the company, the new product features:

  • Shatterproof clear quarter-inch-thick polycarbonate material that can be "easily sanitized";
  • Hooded swivel-casters with brakes;
  • Delivery fully assembled; and
  • An optional mid-level shelf for lightweight digital devices and instructional aids.

The shield is built on a steel truss with an aluminum frame. It's available in a vertical or horizonal orientation and with a choice of "hundreds of colors." The size of the shield is 78 inches by 42 inches.

Production time is estimated to be 18 to 20 days once a purchase order has been submitted.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.