Cleaning Robot Pitched for Classrooms

Imagine a Roomba with a plastic pillar on top, roaming through a room dispensing disinfectant onto chairs, table-tops and other surfaces. That's the latest product from CIRQ+, a start-up that launched by producing a room cleaning system for the hospitality segment. Now the company has turned its attention to classrooms with the release of the CIRQ+ Clean.

As it moves throughout the room, the cbot sprays a cleaning agent that, according to the company, is effective against SARS CoV-2, the novel coronavirus that generates COVID-19, as well as other pathogens.

Described as a smart "cbot," or cleaning robot, the unit is controlled by an in-room hub. As it moves throughout the room, the cbot sprays a cleaning agent that, according to the company, is effective against SARS CoV-2, the novel coronavirus that generates COVID-19, as well as other pathogens.

In a video about the system, the company said the chemical used was "EPA-registered and CDC-approved"; safe for use around adults, children and pets; and safe on fabrics, clothing and other materials.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Texas Recruitment

    Texas Recruitment

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The University of Texas at Austin's Texas Recruitment has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • Porter Family Center

    Porter Family Center for Innovation and Academics

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Porter Family Center for Innovation and Academics has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.