Grand Canyon U Students Help Build COVID-safe Outdoor Theatre

Faculty, staff and students at Grand Canyon University's College of Fine Arts and Production have constructed an outdoor theatre for use this play season, which addresses COVID-19 restrictions while still allowing students (and their audiences) to enjoy live productions. During the first production, The Comedy of Errors, students wore clear face masks.

The project, which took about a month, called on student workers and cast members to pitch in on construction of the stage, which is located on the lawn in front of the college's building.

The university reported that stage lighting will resemble that of a café. Photo by David Kadlubowski, GCU News Bureau

The 40-foot stage is surrounded by designated seating areas for audience members, allowing families to sit together while also remaining distanced from others. The lighting resembles an outdoor café. The set also has a booth for controlling stage lighting and sound. All plays will be livestreamed for people who prefer to watch from home. The first production is already available for viewing on GCU's YouTube channel.

"It's much different than one of our standard builds for a theatrical show because we don't normally have to build an entire theatre," said Technical Director Brad Cozby in a college article.

Cozby said he worked with the college's Dean, Claude Pensis, and Assistant Dean, William Symington, on the effort. "There were a lot of talks among the three of us on how we could make something like this happen," Cozby said. "I was given a list of objectives for what the stage needed to accommodate, and then I took that and worked through the engineering of it all."

"I think that artists and particularly performing arts folks are used to being adaptable," Symington added. "Creative problem-solving is literally what we do every day. When we're working on a project, it's never sort of a set situation where we're like, 'Oh we'll just do it the same way as we've always done it.' It never works that way."

Cozby said his favorite part of the initiative was working alongside students. "They've really thrown themselves into this project whole-heartedly," he noted. "It's just been an absolute joy to work with them and make all of this happen."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • UNL Kiewit Hall

    Designing for Engineering Excellence: Integrating Sustainability and Wellness at UNLs Kiewit Hall

    Kiewit Hall at the University of Nebraska-Lincoln exemplifies how academic institutions can integrate sustainability and wellness into modern learning environments. With an integrated and collaborative team approach, Kiewit Hall addresses enhanced learning and creativity, physical health, and mental wellness, and fosters a sense of community through innovative design, operations, and policy solutions.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

Digital Edition