Grand Canyon U Students Help Build COVID-safe Outdoor Theatre

Faculty, staff and students at Grand Canyon University's College of Fine Arts and Production have constructed an outdoor theatre for use this play season, which addresses COVID-19 restrictions while still allowing students (and their audiences) to enjoy live productions. During the first production, The Comedy of Errors, students wore clear face masks.

The project, which took about a month, called on student workers and cast members to pitch in on construction of the stage, which is located on the lawn in front of the college's building.

The university reported that stage lighting will resemble that of a café. Photo by David Kadlubowski, GCU News Bureau

The 40-foot stage is surrounded by designated seating areas for audience members, allowing families to sit together while also remaining distanced from others. The lighting resembles an outdoor café. The set also has a booth for controlling stage lighting and sound. All plays will be livestreamed for people who prefer to watch from home. The first production is already available for viewing on GCU's YouTube channel.

"It's much different than one of our standard builds for a theatrical show because we don't normally have to build an entire theatre," said Technical Director Brad Cozby in a college article.

Cozby said he worked with the college's Dean, Claude Pensis, and Assistant Dean, William Symington, on the effort. "There were a lot of talks among the three of us on how we could make something like this happen," Cozby said. "I was given a list of objectives for what the stage needed to accommodate, and then I took that and worked through the engineering of it all."

"I think that artists and particularly performing arts folks are used to being adaptable," Symington added. "Creative problem-solving is literally what we do every day. When we're working on a project, it's never sort of a set situation where we're like, 'Oh we'll just do it the same way as we've always done it.' It never works that way."

Cozby said his favorite part of the initiative was working alongside students. "They've really thrown themselves into this project whole-heartedly," he noted. "It's just been an absolute joy to work with them and make all of this happen."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition