3M Announces New Floor Care System

3M’s Commercial Solutions Division launched a new line of products that reduces the labor and product costs associated with routine floor maintenance, according to the company. The 3M™ Advanced Floor Care System allows “users to achieve a striking, high-gloss floor appearance,” while reducing or eliminating the need for burnishing.

“Facility management teams are busier than ever ensuring their facilities are clean and safe for all who enter,” Patrick Kehoe, US & Canada Marketing Manager for 3M Chemicals, Floor Protectors, and Floor Safety products said in a press release. “That’s why we have designed a floor care system that fits seamlessly into their maintenance routine and achieves a beautiful result while also reducing maintenance costs over time.”  

The system includes the 3M™ Clean & Shine Daily Floor Enhancer, the Scotch-Brite™ Clean & Shine Pads, and the Scotchgard™ Protect & Shine Floor Protector.

The Daily Floor Enhancer maintains the gloss of floors and works on both coated and uncoated floors. The Clean & Shine Pads increases the shine of the floor, removes black marks three times faster than traditional cleaning pads, and lasts longer than traditional cleaning pads. The Protect & Shine Floor Protector provides abrasion and soil resistance and reduces maintenance needs by requiring less chemical stripping.

For more information about the products, visit www.3m.com/floorcare.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

  • New Campus Stadiums Evolve Beyond Sports into Community Assets

    New campus planning documents reveal an abundance of high interest in new stadiums, or renovations and repurposing projects for existing facilities. Many universities, in fact, are developing campus complexes with new stadiums as a draw for retail, hotels, and student housing. Multipurpose facilities with high-end features are being designed to attract large sports events of various types, concerts, and other university functions.

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

  • Rush-Henrietta Central School District’s Sperry High School

    A New Perspective: Using Adaptive Reuse Concepts in K-12 Planning

    In the face of increasing pressures on construction timelines, budgets, and material availability, the renovation and reuse of pre-existing structures for new purposes can help bridge the gap between modern school programming and outdated school infrastructure.

Digital Edition