3M Announces New Floor Care System

3M’s Commercial Solutions Division launched a new line of products that reduces the labor and product costs associated with routine floor maintenance, according to the company. The 3M™ Advanced Floor Care System allows “users to achieve a striking, high-gloss floor appearance,” while reducing or eliminating the need for burnishing.

“Facility management teams are busier than ever ensuring their facilities are clean and safe for all who enter,” Patrick Kehoe, US & Canada Marketing Manager for 3M Chemicals, Floor Protectors, and Floor Safety products said in a press release. “That’s why we have designed a floor care system that fits seamlessly into their maintenance routine and achieves a beautiful result while also reducing maintenance costs over time.”  

The system includes the 3M™ Clean & Shine Daily Floor Enhancer, the Scotch-Brite™ Clean & Shine Pads, and the Scotchgard™ Protect & Shine Floor Protector.

The Daily Floor Enhancer maintains the gloss of floors and works on both coated and uncoated floors. The Clean & Shine Pads increases the shine of the floor, removes black marks three times faster than traditional cleaning pads, and lasts longer than traditional cleaning pads. The Protect & Shine Floor Protector provides abrasion and soil resistance and reduces maintenance needs by requiring less chemical stripping.

For more information about the products, visit www.3m.com/floorcare.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.