Charter School Set for Construction on Florida College Campus

The construction of Pinecrest Lakes Academy Middle/High School, a Florida charter school, is set to begin this year on the campus of Lake-Sumter State College in Clermont, Florida. The school is scheduled to open its doors to students in August 2022.

Pinecrest Lakes opened in 2017 as a K-8 school and has a current enrollment of about 750 in those grades. Additionally, 67 high-school freshmen have begun taking classes on the college’s campus. The school plans to admit tenth grade students during the 2021-22 school year and eleventh grade students in 2022-23. The first senior class is slated to graduate in 2024.

The charter school connected with the college about a year to a year and a half ago, according to Pinecrest Lakes Principal Cristina Alcalde, when it became a member of the Health Sciences Collegiate Academy. The lease is part of a STEM education partnership among the college, Lake County Schools, Montverde Academy, the University of Central Florida, and South Lake Hospital.

According to LSSC President Stan Sidor, “Together, we will create pathways for secondary students to work toward credentials and college credit that will accelerate their degree completion and improve the health and wealth of our local economy.”

Pinecrest Lakes is a member of Pinecrest Academy Inc., a charter school network with locations in five Florida counties and one Nevada county.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.