Charter School Set for Construction on Florida College Campus

The construction of Pinecrest Lakes Academy Middle/High School, a Florida charter school, is set to begin this year on the campus of Lake-Sumter State College in Clermont, Florida. The school is scheduled to open its doors to students in August 2022.

Pinecrest Lakes opened in 2017 as a K-8 school and has a current enrollment of about 750 in those grades. Additionally, 67 high-school freshmen have begun taking classes on the college’s campus. The school plans to admit tenth grade students during the 2021-22 school year and eleventh grade students in 2022-23. The first senior class is slated to graduate in 2024.

The charter school connected with the college about a year to a year and a half ago, according to Pinecrest Lakes Principal Cristina Alcalde, when it became a member of the Health Sciences Collegiate Academy. The lease is part of a STEM education partnership among the college, Lake County Schools, Montverde Academy, the University of Central Florida, and South Lake Hospital.

According to LSSC President Stan Sidor, “Together, we will create pathways for secondary students to work toward credentials and college credit that will accelerate their degree completion and improve the health and wealth of our local economy.”

Pinecrest Lakes is a member of Pinecrest Academy Inc., a charter school network with locations in five Florida counties and one Nevada county.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • ZeroEyes, Academic Innovators Partner to Provide Safety Solutions

    ZeroEyes, which produces a multi-analytics weapons detection and threat intelligence platform, recently announced a partnership with Academic Innovators, according to a news release.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Homewood-Flossmoor High School NetZero Addition

    Homewood-Flossmoor High School NetZero Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Homewood-Flossmoor High School NetZero Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.