NC State Enters Phase 4 of Greek Housing Project

North Carolina State University is partnering with KWK Architects and Jenkins-Peer Architects for Phase 4 of its five-phase Greek Village Master Plan. Infrastructure work is in progress for a new apartment building and two new townhouse units.

The apartment building will stand four stories, cover 62,900 square feet, and have room for 147 beds in separate bedrooms. The unit’s main apartment design will be a four-bedroom, two-bathroom apartment with a living room and kitchen.

Design work is also underway for two townhouse units of three stories each. Townhouse A will cover 22,786 square feet and have room for a total of 75 beds, a commercial kitchen, and a shared dining room. Townhouse B will measure in at about 17,136 square feet and contain a total of 57 beds.

Demolition of current structures on the property—two Greek chapter houses, a duplex, and university entomology labs—is scheduled to be finished by June. Construction will begin after that and is expected to be completed by fall 2023.

The NC State Greek Village Master Plan was originally designed in 2006, then redefined in 2014, then redefined again in 2020. The goal of the plan, divided up into five phases, is to convert an outdated housing area into a state-of-the-art neighborhood on campus.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • restroom sinks

    CSU Dominguez Hills Standardizes Plumbing to Improve Restroom Maintenance and Efficiency

    At California State University, Dominguez Hills, facilities leaders have taken steps to standardize restroom fixtures as part of a broader effort to improve maintenance efficiency and control long-term costs.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

Digital Edition