UPenn Library Transforms into High-Tech Hub

The University of Pennsylvania in Philadelphia, Pa., is in the process of revamping its outdated biomedical library into what a press release calls “an open center for cross-disciplinary learning, prototyping, and collaboration.” The university is working with Voith and Mactavish Architects LLP (VMA) to finish the renovations by June 2021 and open the building to students for the fall 2021 academic semester.

The new library space, the Biotech Commons, trades stacks of dusty bookshelves and abandoned cubicles for more modern research tools including tech-integrated conference spaces, a digital fabrication lab with 3D printers, and collaboration classrooms with movable furniture. The library’s location among several university schools (like the schools of nursing, sciences, medicine, and engineering) gives it the ideal opportunity to serve students all over campus, no matter their needs or area of study.

University of Pennsylvania Biotech Commons

“The idea of a library as a quiet, formal space for reference is out-of-step with the future of learning,” said Sennah Loftus, VMA associate principal and the project’s lead designer. “We thought of Biotech Commons as a hub—a truly active place where engineers can come in and talk with the Medical Group over lunch, or industry leaders can meet with students to prototype a new idea together in the fabrication lab.”

Any enrolled student at the school is free to reserve any of the facility’s workspaces, from study rooms to the fabrication shop. The library also doesn’t require a student ID to enter the building, making it accessible to business professionals and the community at large.

Other renovations to the building include replacing its brick façade with floor-to-ceiling windows, opening the once-dark and dingy ground-level lobby to natural light. Both public and private group workspaces are scattered throughout the building, making impromptu meetings or study sessions as easy as finding a place to sit down. A large reading room can be converted into a gathering space that can accommodate up to 80 people.

The building was also designed with durability, ease-of-maintenance, and environmental friendliness in mind with the goal of lowering the facility’s carbon footprint—and its operating costs.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.