N.C. College Resumes Construction on New Academic Building

North Carolina's Meredith College will soon resume work on a new facility to house the institution's communication and exercise and sports science programs. Construction plans had been paused in 2020 when the pandemic struck. The building will be located on the northwestern side of the school's 225-acre campus.

The 13,000-square-foot structure will include a number of common areas as well as dedicated spaces, including an "agency-style" classroom, a media studio and editing rooms, a human performance lab, an assessment lab and conference room.

Meredith College construction
Photo credit: Meredith College

Both academic programs have grown significantly in the past decade. According to the college, enrollment in Meredith's undergraduate communication program has grown by 29% and the exercise and sports science program by 52% since 2011.

Design is being handled by Design Development Architects, also Raleigh-based. The general contractor for the project is Inland Construction, with headquarters in Garner, N.C.

Work on the new building is expected to be done during the next academic year. A virtual tour is available on YouTube.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.