George Mason University Gets Replacement Water Tank

George Mason University, located in Fairfax, Va., recently saw the installation of a new, 2.5-million-gallon water tank. The new tank stands 156 feet tall and provides water to the university campus and surrounding housing area.

The former tank was demolished in January 2019, and the new one was built and put into service on Oct. 22, 2020. During the interim, the campus and surrounding areas received water from a different part of the city’s water distribution system.

The tank is property of Fairfax Water, who was responsible for the demolition and construction both. It will be paid for “via water rates, fees, and charges,” said Fairfax Water spokesman Susan Miller. It was built in the same spot as the previous one, which was smaller, lower-capacity, and erected in 1978. The concrete base was finished in December 2019, and the steel storage bowl was moved into place in April 2020.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Barbara Vick Western Branch

    Barbara Vick Western Branch

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Barbara Vick Western Branch has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.