George Mason University Gets Replacement Water Tank

George Mason University, located in Fairfax, Va., recently saw the installation of a new, 2.5-million-gallon water tank. The new tank stands 156 feet tall and provides water to the university campus and surrounding housing area.

The former tank was demolished in January 2019, and the new one was built and put into service on Oct. 22, 2020. During the interim, the campus and surrounding areas received water from a different part of the city’s water distribution system.

The tank is property of Fairfax Water, who was responsible for the demolition and construction both. It will be paid for “via water rates, fees, and charges,” said Fairfax Water spokesman Susan Miller. It was built in the same spot as the previous one, which was smaller, lower-capacity, and erected in 1978. The concrete base was finished in December 2019, and the steel storage bowl was moved into place in April 2020.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.