Ore. District Breaks Ground on Two New Elementary Schools

The Hermiston School District, located in Hermiston, Ore., celebrated the groundbreaking of two new elementary schools last week. One replacement facility and one new facility are both set to open in the Eastern Oregon district in 2022.

The replacement facility is a new home for Rocky Heights Elementary. It will have a capacity of 600 students and measure in at 73,500 square feet. The $23-million building will be one story and contain 24 classrooms, a library, a gym, and other student common areas. The building will be constructed at the former site of the current school’s athletic fields. Students will continue attending school in the existing building for the 2021-22 academic year until the new school opens in fall 2022. The existing Rocky Heights Elementary was built in 1962 and faces a multitude of maintenance and security issues, according to the East Oregonian.

The other construction is for a new elementary school to be known as Loma Vista Elementary School. Loma Vista will also have capacity for 600 students and have a layout very similar to the new Rocky Heights Elementary. The school is scheduled to open in time for the 2022-23 academic year.

Funds for the construction of both buildings come from an $87.2 million bond that passed in 2019. The bond will also fund a new softball complex for the district, a new classroom annex at Hermiston High School, the purchase of additional property for future construction projects, and upgrades to parking areas at several schools in the district. The district is partnering with BBT Architects for design and Kirby Nagelhout Construction Co. for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.