Ore. District Breaks Ground on Two New Elementary Schools

The Hermiston School District, located in Hermiston, Ore., celebrated the groundbreaking of two new elementary schools last week. One replacement facility and one new facility are both set to open in the Eastern Oregon district in 2022.

The replacement facility is a new home for Rocky Heights Elementary. It will have a capacity of 600 students and measure in at 73,500 square feet. The $23-million building will be one story and contain 24 classrooms, a library, a gym, and other student common areas. The building will be constructed at the former site of the current school’s athletic fields. Students will continue attending school in the existing building for the 2021-22 academic year until the new school opens in fall 2022. The existing Rocky Heights Elementary was built in 1962 and faces a multitude of maintenance and security issues, according to the East Oregonian.

The other construction is for a new elementary school to be known as Loma Vista Elementary School. Loma Vista will also have capacity for 600 students and have a layout very similar to the new Rocky Heights Elementary. The school is scheduled to open in time for the 2022-23 academic year.

Funds for the construction of both buildings come from an $87.2 million bond that passed in 2019. The bond will also fund a new softball complex for the district, a new classroom annex at Hermiston High School, the purchase of additional property for future construction projects, and upgrades to parking areas at several schools in the district. The district is partnering with BBT Architects for design and Kirby Nagelhout Construction Co. for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Barbara Vick Western Branch

    Barbara Vick Western Branch

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Barbara Vick Western Branch has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.