Ore. District Breaks Ground on Two New Elementary Schools

The Hermiston School District, located in Hermiston, Ore., celebrated the groundbreaking of two new elementary schools last week. One replacement facility and one new facility are both set to open in the Eastern Oregon district in 2022.

The replacement facility is a new home for Rocky Heights Elementary. It will have a capacity of 600 students and measure in at 73,500 square feet. The $23-million building will be one story and contain 24 classrooms, a library, a gym, and other student common areas. The building will be constructed at the former site of the current school’s athletic fields. Students will continue attending school in the existing building for the 2021-22 academic year until the new school opens in fall 2022. The existing Rocky Heights Elementary was built in 1962 and faces a multitude of maintenance and security issues, according to the East Oregonian.

The other construction is for a new elementary school to be known as Loma Vista Elementary School. Loma Vista will also have capacity for 600 students and have a layout very similar to the new Rocky Heights Elementary. The school is scheduled to open in time for the 2022-23 academic year.

Funds for the construction of both buildings come from an $87.2 million bond that passed in 2019. The bond will also fund a new softball complex for the district, a new classroom annex at Hermiston High School, the purchase of additional property for future construction projects, and upgrades to parking areas at several schools in the district. The district is partnering with BBT Architects for design and Kirby Nagelhout Construction Co. for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Spaces4Learning Announces 2026 Product Award Winners

    Spaces4Learning has just announced the winners of the 2026 Product Awards! The award program spotlights outstanding product development achievements of manufacturers and suppliers whose products or services are considered to be particularly noteworthy in their ability to enhance K–12 and higher-education learning environments.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.