Ore. District Breaks Ground on Two New Elementary Schools

The Hermiston School District, located in Hermiston, Ore., celebrated the groundbreaking of two new elementary schools last week. One replacement facility and one new facility are both set to open in the Eastern Oregon district in 2022.

The replacement facility is a new home for Rocky Heights Elementary. It will have a capacity of 600 students and measure in at 73,500 square feet. The $23-million building will be one story and contain 24 classrooms, a library, a gym, and other student common areas. The building will be constructed at the former site of the current school’s athletic fields. Students will continue attending school in the existing building for the 2021-22 academic year until the new school opens in fall 2022. The existing Rocky Heights Elementary was built in 1962 and faces a multitude of maintenance and security issues, according to the East Oregonian.

The other construction is for a new elementary school to be known as Loma Vista Elementary School. Loma Vista will also have capacity for 600 students and have a layout very similar to the new Rocky Heights Elementary. The school is scheduled to open in time for the 2022-23 academic year.

Funds for the construction of both buildings come from an $87.2 million bond that passed in 2019. The bond will also fund a new softball complex for the district, a new classroom annex at Hermiston High School, the purchase of additional property for future construction projects, and upgrades to parking areas at several schools in the district. The district is partnering with BBT Architects for design and Kirby Nagelhout Construction Co. for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition