Construction Begins on New Denver Middle/High School

Construction on a new middle/high school has begun in the Denver Community School District in Denver, Colo. The new facility will relieve space and capacity issues at the district’s existing school buildings, as its elementary, middle, and high schools currently share a single campus. The new middle/high school will be built separately.

It will be attached to the Cyclone Center, the Denver High School athletic facility built in 2017. Construction of the Cyclone Center was Phase I of a continuing construction and expansion project for DCSD. “We always knew we wanted to upgrade our facilities to match the quality of education that our kids are receiving,” said Denver Community School District Superintendent Brad Lauers.

The $16.44-million, 75,500-square-foot middle/high school is scheduled to open in fall 2022. It will initially welcome 500 students in grades 6-12, but it has the capacity to hold up to 800 as enrollment expands. The district has welcomed 100 new students to its population during the last three years.

The existing school facilities are being pushed to their limits. Storage spaces have been converted into classroom, and an outdoor weight room has become the school’s music room. “It was time to stretch out a little bit,” said Lauers. “We’re a growing community, a growing district, and this will allow us to meet the needs of our students.”

Bids for the project came in slightly higher than expected, and as a result, a planned wrestling room was going to be scrapped. However, the school’s wrestling club is fundraising with a goal of $275,000 to be able to include the space in the new building.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.