Construction Begins on New Denver Middle/High School

Construction on a new middle/high school has begun in the Denver Community School District in Denver, Colo. The new facility will relieve space and capacity issues at the district’s existing school buildings, as its elementary, middle, and high schools currently share a single campus. The new middle/high school will be built separately.

It will be attached to the Cyclone Center, the Denver High School athletic facility built in 2017. Construction of the Cyclone Center was Phase I of a continuing construction and expansion project for DCSD. “We always knew we wanted to upgrade our facilities to match the quality of education that our kids are receiving,” said Denver Community School District Superintendent Brad Lauers.

The $16.44-million, 75,500-square-foot middle/high school is scheduled to open in fall 2022. It will initially welcome 500 students in grades 6-12, but it has the capacity to hold up to 800 as enrollment expands. The district has welcomed 100 new students to its population during the last three years.

The existing school facilities are being pushed to their limits. Storage spaces have been converted into classroom, and an outdoor weight room has become the school’s music room. “It was time to stretch out a little bit,” said Lauers. “We’re a growing community, a growing district, and this will allow us to meet the needs of our students.”

Bids for the project came in slightly higher than expected, and as a result, a planned wrestling room was going to be scrapped. However, the school’s wrestling club is fundraising with a goal of $275,000 to be able to include the space in the new building.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Fellowes Expands Finish and Wall-Covering Options for Architectural Wall Systems

    Fellowes Architectural Solutions has expanded the materials library for its architectural wall systems with a series of new finishes and wall-covering options intended to provide architects and designers with additional choices for commercial interiors, according to a company news release.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • UCF Modernizes College of Hospitality Management

    The University of Central Florida in Orlando, Fla., recently completed a major renovation effort for the Rosen College of Hospitality Management, according to a news release. The project modernized 77,600 square feet worth of academic classrooms, teaching labs, and collaborative spaces to support both students and faculty.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.