Construction Begins on New Denver Middle/High School

Construction on a new middle/high school has begun in the Denver Community School District in Denver, Colo. The new facility will relieve space and capacity issues at the district’s existing school buildings, as its elementary, middle, and high schools currently share a single campus. The new middle/high school will be built separately.

It will be attached to the Cyclone Center, the Denver High School athletic facility built in 2017. Construction of the Cyclone Center was Phase I of a continuing construction and expansion project for DCSD. “We always knew we wanted to upgrade our facilities to match the quality of education that our kids are receiving,” said Denver Community School District Superintendent Brad Lauers.

The $16.44-million, 75,500-square-foot middle/high school is scheduled to open in fall 2022. It will initially welcome 500 students in grades 6-12, but it has the capacity to hold up to 800 as enrollment expands. The district has welcomed 100 new students to its population during the last three years.

The existing school facilities are being pushed to their limits. Storage spaces have been converted into classroom, and an outdoor weight room has become the school’s music room. “It was time to stretch out a little bit,” said Lauers. “We’re a growing community, a growing district, and this will allow us to meet the needs of our students.”

Bids for the project came in slightly higher than expected, and as a result, a planned wrestling room was going to be scrapped. However, the school’s wrestling club is fundraising with a goal of $275,000 to be able to include the space in the new building.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Greenheck Launches New Series of Rooftop Units

    Air movement, control, and conditioning solutions provider Greenheck recently launched a new line of rooftop units that merge the conveniences of traditional rooftop ventilators and dedicated outdoor air systems, according to a news release. The Model RT controls temperature and humidity for indoor comfort.

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Addressing the Housing Affordability Crisis Through Creative Campus Development

    Many Southern California college and university campuses are living amidst surging housing costs, driving the need to house more of their populations on campus. Especially for community colleges, the need to support millions of unhoused and housing insecure students has become a prominent issue that lawmakers and institutions alike are trying to solve.

Digital Edition