Construction at Texas University Causes Small Fire

Renovations to the Moody Coliseum on the campus of Abilene Christian University in Abilene, Texas, resulted in a small fire on Tuesday night. The Abilene Fire Department responded to the call at about 10:30 p.m. and extinguished the flames without incident.

The fire was located in an upper area of the structure that was under construction; university officials said that it was on rebar near the roof. Several firetrucks arrived at the scene. Firefighters were able to put out the fire before it caused any significant damage, and there were no injuries reported.

The department estimated the damage at about $5,000. University spokeswoman Wendy Kilmer said that the fire was related to ongoing construction, but its exact cause—as well as its effect on construction moving forward—is still under investigation.

Renovations to the Moody Coliseum began in December. Upgrades to the 50-year-old sports arena will include extra leg room, larger seats, an added hospitality room, and accessibility upgrades. In order to improve the comfort of event attendees, the arena’s capacity is being reduced from about 4,100 to about 3,600. The project is scheduled for completion in August 2022.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.