Construction at Texas University Causes Small Fire

Renovations to the Moody Coliseum on the campus of Abilene Christian University in Abilene, Texas, resulted in a small fire on Tuesday night. The Abilene Fire Department responded to the call at about 10:30 p.m. and extinguished the flames without incident.

The fire was located in an upper area of the structure that was under construction; university officials said that it was on rebar near the roof. Several firetrucks arrived at the scene. Firefighters were able to put out the fire before it caused any significant damage, and there were no injuries reported.

The department estimated the damage at about $5,000. University spokeswoman Wendy Kilmer said that the fire was related to ongoing construction, but its exact cause—as well as its effect on construction moving forward—is still under investigation.

Renovations to the Moody Coliseum began in December. Upgrades to the 50-year-old sports arena will include extra leg room, larger seats, an added hospitality room, and accessibility upgrades. In order to improve the comfort of event attendees, the arena’s capacity is being reduced from about 4,100 to about 3,600. The project is scheduled for completion in August 2022.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition