Construction at Texas University Causes Small Fire

Renovations to the Moody Coliseum on the campus of Abilene Christian University in Abilene, Texas, resulted in a small fire on Tuesday night. The Abilene Fire Department responded to the call at about 10:30 p.m. and extinguished the flames without incident.

The fire was located in an upper area of the structure that was under construction; university officials said that it was on rebar near the roof. Several firetrucks arrived at the scene. Firefighters were able to put out the fire before it caused any significant damage, and there were no injuries reported.

The department estimated the damage at about $5,000. University spokeswoman Wendy Kilmer said that the fire was related to ongoing construction, but its exact cause—as well as its effect on construction moving forward—is still under investigation.

Renovations to the Moody Coliseum began in December. Upgrades to the 50-year-old sports arena will include extra leg room, larger seats, an added hospitality room, and accessibility upgrades. In order to improve the comfort of event attendees, the arena’s capacity is being reduced from about 4,100 to about 3,600. The project is scheduled for completion in August 2022.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • Delta State University Completes Renovations to School of Nursing Facilities

    Delta State University recently completed a major expansion and renovation project for the Robert E. Smith School of Nursing facilities on its campus in Cleveland, Miss., according to a news release. The project includes about 14,000 square feet of new construction and more than 21,000 square feet of renovation work to the existing space.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Elevating Campus Maintenance: How Power Wash Drones are Transforming Educational Facilities

    As today’s campuses grow larger and more architecturally complex, keeping exteriors clean, safe, and inviting has never been tougher. Facilities leaders are under constant pressure to stretch budgets, meet safety standards, and support sustainability goals—all while tackling the stubborn challenge of exterior cleaning.

Digital Edition