EXTECH Provides Skylight System to Calif. Middle School

EXTECH/Exterior Technologies, Inc. has provided skylight systems for the new Spring Hill School middle school campus in Sonoma County, Petaluma, Calif. The campus opened its doors to students for the first time for the 2019-20 school year. The middle school was designed by DMARC Studio, constructed by Advanced Building Solutions, and offers a variety of indoor and outdoor learning spaces for up to 120 students.

The building features a learning center / conference room, idea lab, math center, makerspace studio including a 3D printer, and indoor and outdoor learning classrooms. A covered walkway featuring EXTECH’s skylight system connects the outdoor learning spaces, providing daylight and ventilation to students. The SKYGARD 2500 Series skylight system covers an area about 168 feet long by 6 feet wide at a consistent slope of 1:12 across the entire span.

EXTECH skylight system
Photo by Kaplan Photo, courtesy of EXTECH

Each of its 55 panels come in a variety of sizes and are made of laminated glass more than half an inch thick and framed with anodized aluminum. The aluminum is made of recycled materials.

“Our skylights not only support sustainable daylight designs, but also provide a cost-effective choice for fabrication, installation and maintenance,” said EXTECH general manager Jim Leslie. “Backed with a 10-year warranty, our skylight system continues to add value for school districts, building owners and facility managers for years to come.”

The Spring Hill School opened in 1975 to offer a Montessori-based education to students in pre-kindergarten through fourth grade. The new middle school campus expands those opportunities through eighth grade. The program includes a distinct focus on humanities, science, technology, engineering, arts and math (STEAM). This educational style and STEAM focus influenced the inclusion of nontraditional learning spaces to increase flexibility and student health and offer an aesthetic touch.

“This challenge was approached by utilizing a unique structural system that not only provides flexibility for the instructional spaces within the building, but also provides a design aesthetic inspired by the STEAM curriculum when exposed,” said DMARC. “The classrooms’ connection to the outdoors provides unique educational spaces for the students and maximizes usable space.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition